Knight Aerospace
7 federal contracts worth $19.9M ($19,887,982), counted once each at their latest stated value. 5 are non-competitive ($240K).
By fiscal year
By department
| Department | Contracts | Value |
|---|---|---|
| National Defence | 7 | $19.9M |
Largest contracts
Up to 60, largest first. "Original" is the original contract value stated in the same latest record, where it states one.
| # | Contract and record text | Procedure and reason | Original | Value |
|---|---|---|---|---|
| 1 | National Defence · 2022-05-31 Measuring, controlling, laboratory, medical and optical equipment and parts This contract is a result of an advance contract award notice. This contract was sole sourced. Measuring, controlling, laboratory, medical and optical equipment and parts, San Antonio, Texas | AC Advance Contract Award Notice | $9,792,250 | $9,947,250 |
| 2 | National Defence · 2024-02-22 Aircraft parts This contract is a result of an advance contract award notice. This contract was sole sourced. Aircraft parts, CFB Trenton | AC Advance Contract Award Notice Limited tendering reason: 05 No response to bid solicitation | $9,700,702 | $9,700,702 |
| 3 | National Defence · 2021-10-21 Measuring, controlling, laboratory, medical and optical equipment and parts This contract was sole sourced. Measuring, controlling, laboratory, medical and optical equipment and parts, Trenton, ON | TN Non-Competitive Limited tendering reason: 71 Exclusive rights | $149,887 | $149,887 |
| 4 | National Defence · 2021-12-10 Other professional services not elsewhere specified This contract was omitted from a previous public disclosure. This contract was sole sourced. Other professional services not elsewhere specified, Trenton,ON | TN Non-Competitive Limited tendering reason: 71 Exclusive rights | $36,346 | $36,346 |
| 5 | National Defence · 2022-03-31 Miscellaneous manufactured articles This contract was omitted from a previous public disclosure. This contract was sole sourced. Miscellaneous manufactured articles, Trenton, ON | TN Non-Competitive Limited tendering reason: 71 Exclusive rights | $21,253 | $21,253 |
| 6 | National Defence · 2021-01-08 Engineering consultants-Construction This contract was sole sourced. Engineering consultants-Construction, CFB Trenton | TN Non-Competitive Limited tendering reason: 74 Additional deliveries (formerly Interchangeable Parts) | $17,203 | $17,203 |
| 7 | National Defence · 2026-04-01 Other equipment and Parts This contract was sole sourced. Other equipment and Parts, CFB Trentno | TN Non-Competitive | $15,341 | $15,341 |
Names grouped on this page
The vendor names, exactly as written in the records, that this page treats as one vendor.
- Knight Aerospace